Dev.to1 min read
We Moved a Production System from Azure VMs to...
This wasn’t one of those long, overplanned migrations that drag on for years. It took us about three months from start to finish, and most of that time was spent being careful rather than building something complicated. The system we inherited was running on Azure with multiple VMs, a self-managed MySQL instance, and a load balancer in front. It had all the symptoms of something that had grown without a plan. Everything was configured manually. No infrastructure as code, no containers, no orches
Read original on dev.to0
0Related
Hacker News
$500 GPU outperforms Claude Sonnet on coding benchmarks
Discussed on Hacker News with 377 points and 217 comments.
377
217Hacker News
Whistler: Live eBPF Programming from the Common Lisp REPL
Discussed on Hacker News with 115 points and 13 comments.
115
13Hacker News
Anthropic Subprocessor Changes
Discussed on Hacker News with 98 points and 44 comments.
98
44Get the 10 best reads every Sunday
Curated by AI, voted by readers. Free forever.
Liked this? Start your own feed.
Comment
Sign in to join the discussion.
Loading comments…